Lane Closures Continue on Taylor Ridge Next Week

Lane Closures Continue on Taylor Ridge Next Week

June 26th, 2021 – 4:25 PM

Georgia Department of Transportation –

Weather permitting, crews will continue to repair the roadway at Taylor Ridge on Highway 27. The work next week will require occasional lane closures with traffic being led by a pilot car.

WHEN: Monday, June 28 through Thursday, July 1 from 9 a.m. until 2:30 p.m. each day as needed. Any lane closures required on Friday, July 2 will be completed by 12 p.m.

WHERE: The southbound lane of Highway 27 at Taylor Ridge will be closed as needed. Traffic will be paced in each direction through the area with a pilot car.